FeCrAl 0Cr25Al5 Alloy Strip
Price: |
20.0~50.0 USD |
Payment Terms: |
T/T,L/C,D/A,D/P,WU |
Place of Origin: |
Beijing, China (Mainland) |
Product Detail
Means of Transport:
Ocean,Land,Air
Packing:
Sealed up with plastic, out...
FeCrAl Strip:
Iron-Chromium-Aluminum Stri...
Production Capacity:
2 Tons per Month
Delivery Date:
3-40days
1.High resistance, low temperature coefficient
2.Good corrosion resistance under high temperature
3.Thickness: Min0.05mm
FeCrAl 0Cr25Al5 Resistance Heating Strip
Heanjia Super-metals Co., Ltd. suppliesFeCrAl 0Cr25Al5 Resistance Heating Strip. FeCrAl 0Cr25Al5 Resistance Heating Strip is a high-temperature ferritic iron-chromium-aluminium alloy (FeCrAl alloy) Strip which is recommended for element temperatures up to 1250°C. It is especially recommended where excellent oxidation and life properties in combination with good form stability properties are required. 0Cr25Al5 is used in electrical heating elements in industrial furnaces and in the appliance industry.
Chemical Composition
Alloy | Cr% | Al% | Fe% | Re% |
0Cr25Al5 | 23.0-26.0 | 4.5-6.5 | Bal. | Adequacy |
Properties
Alloy | Specific Resistance (at 20°C) (µΩ-m) | Hardness HB | Linear Expansion Coeff. (T=20 – 1000°C) x10-6 | Maximum Operating Temperature of Element (°C) |
0Cr25Al5 | 1.45±0.07 | 200-260 | 16.0 | 1250 |
Strip Specification
Manufacture Process
The manufacture of strip is started with producing the ingot by advanced vacuum melting process. The trip production includes forging, rolling, annealing, acid-washing, polishing, cutting etc. The strip is produced to the required sizes. From the ingot to the final strip, manufacture process is operated with high standard quality control system. There will be quality test for each batch of product, such as test to thickness tolerance, content, hardness, etc.
Packing Process & Transportation
Packaging: Seal up, with plastic inside and wooden case or carton outside; or according to the customer's requirements.
Transportation: By air or By sea
Other Terms
Minimum Order Quantity | Manufacture Period | Payment Terms |
50 KG | 10-15 Days (Small Quantity) | 20-40 Days (Mass Quantity) | L/C, T/T, Western Union |
Didn't find what you're looking for?
Post Buying Lead or contact
HiSupplier Customer Service Center
for help!
Related Search
Find more related products in following catalogs on Hisupplier.com